Image shows the excavation site for the River Pump House looking west. The Columbia River can be seen in the upper right portion. Several pieces of construction equipment are also visible.
Photo is looking northwest of a heating plant under construction. Workers can be seen performing various tasks. There are various construction materials and equipment.
Photo is looking northeast of the Main Office building under construction. Workers can be seen performing various tasks related to masonry and other construction techniques.
Image is looking northeast. Building is under construction enclosed in scaffolding and a cement truck backed towards an opening in the front of the building.
Looking south east. Phot of completed 303-K storehouse with venting pipe. One stack can be seen in the background, along with other buildings, and power line poles.
Looking Northwest. Scaffolding surrounds the cinder block walls of the substation. Three workers stand on top of the scaffolding, one is looking towards the camera while two look into the substation. Another workman is climbing timber…
Looking north east shown is the in-work construction progress of Building 305. Several workers can be seen positioning various building materials (beams and blocks). There are two cranes at either end of the building, with several piles of other…
This collection consists of various reports and literature collected by Bill Kennedy during his career in waste control at the Hanford Site. This material is published but not readily available in the library or public document system.
The collection contains color photographs, color transparencies, color copies of photographs, and contact sheets. These all relate to the Russian visits to the Hanford Site in the 1990s and early 2000s.